This article reflects the question of how the need for long-term efficiency improvement at airports can be met through an adapted masterplanning process. It particularly focuses on the early phase of capacity planning. I will describe why, in the future, a true holistic strategy process for airports will be essential, and provide three examples of how this could be achieved in practice.

THE NEED FOR EFFICIENCY IMPROVEMENT CHANGES THE PARADIGMS IN AIRPORT PLANNING

These days, airport development takes place under high economic pressure and with constrained logistical resources. The majority of today’s masterplan projects are expansions of existing airports, not prestigious greenfield projects. The budgets for future infrastructure are limited and there is a clear expectation that the masterplan’s business case must be able to prove its profitability. Additionally, more and more airports are faced with a lack of space for enlargement or are confronted with tight regulatory restrictions, such as noise protection.

Over the past two to three years, the need for efficiency improvement has become a common challenge in the industry. Airports can no longer react to the constantly increasing demands by merely adding more infrastructure. Although some airports have begun to improve individual processes, such as self-check-in or automated passport control, these are still stand-alone solutions. From a long-term perspective, a couple of unrelated individual improvements here and there will not be enough.

The project for the redevelopment of La Guardia Airport in New York City is currently one of the most striking examples how airport planning must react to a limited amount of available space. (Rendering: HOK Architects, La Guardia Airport)

TRADITIONAL METHODS DO NOT DELIVER SUFFICIENT INFORMATION FOR MAKING STRATEGIC DECISIONS

Traditionally, capacity planning has been carried out in a primarily linear, technical and one-dimensional fashion: An unconstrained traffic forecast delivers the basis and the forecasted capacity minus the existing airport capacity indicates the capacity demands for future growth. Even if the traffic forecast used is worked out in scenarios, these will differentiate only in the assumed level of growth.

Additionally assumptions used in capacity planning are not communicated transparently or reflected strategically. This is realised by the airport management only at a very late stage in the masterplan process, when the cost estimates for future expansion are presented. But at this point, it becomes very difficult and time-consuming to go back and change the fundamental assumptions of the masterplan.

Over the past two to three years, the need for efficiency improvement has become a common challenge in the industry. (New check-in area, Melbourne Airport)

FUTURE MASTERPLAN RESULTS ARE DEFINED IN CAPACITY PLANNING

Most people involved in masterplan processes greatly underestimate the extent to which future results are already defined in the early phases of the project: How a traffic forecast is set up, the interpretation of the traffic forecast results and the transformation of the forecasted future demand via a capacity calculation into a capacity demand program, all have a strong impact on determinations for the size and budget of the resulting plan.

From a strategic point of view, problems in the capacity planning phase are often:

ALTERNATIVE APPROACHES TO CAPACITY PLANNING – THREE CASE STUDIES

How can capacity planning react to these new conditions? The following short examples taken from my personal practice provide an overview of what this might look like in a variety of masterplanning situations.

CASE STUDY 1: STRATEGIC EFFICIENCY GOALS HELP TO INCREASE FUTURE TERMINAL CAPACITY

A major hub airport was building a terminal expansion. The ongoing traffic growth was greater than the original forecast that had been developed a number of years earlier for the terminal design. The hub carrier at the airport was already worried from the outset that the terminal would be too small and requested that an immediate additional expansion of the terminal be begun. Due to the airport’s tight economic situation and the long timeline required for such an expansion project, this was not a feasible option. The airport’s CEO requested a capacity analysis and proposals for resolving the situation.

The analysis delivered the following results:

Our capacity analysis led to a long, but very fruitful, strategic discussion. The airport management decided to establish a process efficiency improvement program for the existing terminal as well as for the expansion. This would deliver enough additional capacity to meet the expected demand, so that the requested additional building expansion would not become necessary for several years. However, it became also clear that, to reach its goals, the process efficiency improvement program would need a team, a budget and management support.

What this case study reveals:

Influence of processing time on capacity: The figure shows the capacity of 40 check-in counters with different process times per passenger (60, 90, 120 and 150 seconds / pax). The calculation takes into account IATA service level optimum with a maximum waiting time per PAX (mqt) of 15 minutes.

CASE STUDY 2: RE-DESIGN OF PROCESSES ALLOWS FOR SMALLER TERMINAL BUILDING AND AN IMPROVED CURB-SIDE TRAFFIC SITUATION.

During a masterplan project, the airport’s commercial department requested the implementation of 1,000 sq m commercial area per million passengers for the future terminal expansion. Historically at this airport, there was an additional demand for 25% in storage and staff areas. The new terminal was planned for 25 million passengers. Taking into account the circulation and technical areas, this resulted in a programme calling for more than 7,000 sq m of secondary room area. However, the first drafts of the terminal layout made during masterplanning showed that the property available at the airport was not large enough to fulfil this request.
 
In our proposal, we re-designed the complete delivery and storage process for the commercial areas. Instead of including them in the terminal building, we relocated the majority of the secondary areas to a dedicated logistics centre approximately 2 kilometres away from the terminal. From there, goods would be delivered to the terminal in small batches several times during the day. The shift beginnings and ends for the commercial area employees would also take place in this building, which would allow changing and administrative rooms to be located there.

Advantages achieved:

What this case study reveals:

The example shows that the ability to disrupt and completely re-design specific airport processes can generate totally new approaches to solving a problem. In most cases, far greater results can be achieved than with making improvements to an existing process. Next to the actual re-design of the process, the most challenging aspect is finding solutions for the various concerns of the stakeholders involved, which – as in any change process – will arise.

Re-designed process for commercial terminal-logistics: the supplier vehicles deliver their goods to the logistics centre outside of the core airport area. There, the goods are stored, security-checked and, if necessary, also unpacked and distributed to smaller delivery units. The final transport to the terminal is conducted by smaller delivery vehicles from a certified service partner. To reduce the storage space needed in the terminal to an absolute minimum, the deliveries will take place several times a day according to a fixed schedule.

CASE STUDY 3: IMPROVING A MASTERPLAN BUSINESS CASE WITH ACTIVE PEAK DEMAND MANAGEMENT.

While working out a masterplan, the project team realised from the initial business plan model results that the infrastructure that had been planned on the basis of the traffic forecast would not be economically feasible. As consultants, we wanted to provide the client with a situation where he would have a variety of strategic solutions for reacting to this situation. We therefore conducted an internal problem-solving workshop. The following approaches to improving the situation were taken under consideration:

In the end, the client decided to improve the business case through the combination of a reduction to terminal area and a moderate increase to future fees and commercial revenue goals in the business plan.

Example of possible product differentiation: Gate holding room, calculated for Code C aircrafts with an average of 180 pax, IATA service level optimum vs. sub-optimum.

What this case study reveals:

Conclusion

A more holistic approach to the capacity planning phase in airport planning may be challenging, but it is essential. It will require a high degree of management involvement and the letting-go of some traditional beliefs. Most probably, it will also require more time and effort from all parties involved, as the strategic discourse will only function if alternative options, which truly differ from each other, can be compared. The outcome of such a process will deliver a robust roadmap and strategic guidance which will then allow all parties to proceed in a much more aligned and rapid manner.

Just as Apple rose to become the world’s most successful computer company by holistically developing hardware and software in combination, airports of the future must, at an early stage of masterplanning, combine the planning of processes-improvement with infrastructure development. Only when all strategic options for building infrastructure, operational processes, and commercial activities as well as security, IT and digitalisation are simultaneously analysed and discussed by the same group of people, will fundamental change be successful.

Successful fundamental change based on a holistic development process

Obviously, such a strategic approach to capacity planning and to the overall masterplan process is only a first step in increasing airport infrastructure efficiency.  It is crucial that airports and masterplanning consultants also acquire additional process improvement knowledge. The entire airport development project process must become more agile, which will require that a certain portion of today’s construction budgets be dedicated to efficiency improvement programs.

Download the article
Oliver Hebeisen works as a partner at amd.sigma and as a senior airport planner for Munich Airport International. He has 30 years of experience in the planning of complex building projects. Since 2005, he has specialised in airport planning.